Adaptive reuse of the former San Marco Theatre into a restaurant and bar.
Size: 4,900 square feet
Cost: $1.36 million
Completed: May 12, 2025
Architect: ai3 Inc., Atlanta
Contractor: Urban Partners Construction
Additional vendors: Happy Cat Electric, Padgett’s Air Conditioning & Heating Inc., Barry Parker Plumbing

The design inspires vibrancy through energized color, rich texture and a sense of playful liveliness to the space that was once a movie theater. Elements of the former space were preserved, including the original brick and movie projector, while adding large storefront windows to bring in more natural light. Along with the vintage bar and open seating, outdoor dining and private indoor dining areas were created.