JAA board approves lease for Scannell to build $26 million Boeing facility

The real estate company intends to develop and lease the repair, maintenance and warehouse center at Cecil Airport to the aerospace company.


The 146,645-square-foot facility comprises parking, roads, access drives and stormwater control facilities at the West Jacksonville airport.
The 146,645-square-foot facility comprises parking, roads, access drives and stormwater control facilities at the West Jacksonville airport.
  • Columnists
  • Mathis Report
  • Share

The Jacksonville Aviation Authority board voted 7-0 on Sept. 26 to lease property to Scannell Properties at Cecil Airport to build a $26 million component repair, maintenance and warehouse facility for The Boeing Co.

The JAA board approved a ground lease for 18.3 acres to Scannell, which intends to build a 146,645-square-foot facility with parking, roads, access drives and stormwater control facilities at the West Jacksonville airport.

JAA CEO Mark VanLoh and Chief Development Officer Jay Cunio submitted the lease to the board for approval.

VanLoh and Cunio signed the submission Sept. 16. It says management recommends that the JAA board approve the ground lease between JAA and Scannell and authorizes VanLoh to execute the necessary documents.

Indianapolis-based Scannell will lease the land from JAA and sublease the improved property to Boeing, according to the JAA staff recommendation to the board.

The initial lease term is 27 years with an option to extend for 13 years and an additional option for 10 years, not to exceed 50 years.

The ground rent for the initial lease is 25 cents per square foot per year, or about $199,287 in annual rent based on 18.3 acres.

The site is near a 400,600-square-foot Boeing project under construction.
The site is near a 400,600-square-foot Boeing project under construction.

The ground rent is subject to an annual 3% increase for the second through fifth years, and then 2.25% a year for years six through 27. 

Starting with the first extension option, the ground rent is reset based on an appraisal of fair market value and then increased annually at 2.25%.

Scannell will spend at least $26 million on the project design and construction. It will have the right to assign the lease agreement to Boeing “or any other qualified Assignee with JAA approval.”

Boeing uses multiple facilities at Cecil Airport.

The JAA management submission explains that in 2020, the authority responded to a Boeing request for proposal under the code name “Project Shockwave” for a new maintenance, repair and overhaul facility with offices and support space.

The board approved the lease with Boeing in December 2020. The 400,600-square-foot project is under construction.

Boeing is considered a legacy tenant whose presence at Cecil Airport predates JAA’s acquisition of the property.

The JAA submission says Boeing leases six facilities totaling 394,335 square feet on the west side of the airfield.

The facilities provide mission support, aircraft maintenance, engineering and training for the U.S. Navy and other military and civilian aviation interests.

The city has been reviewing civil engineering plans for the Scannell project. Pond is the civil engineer.

Those plans show the facility on the east side of Approach Road, south of 103rd Street. 

The Project Shockwave facility is on the west side of Approach Road.

Scannell is a privately owned commercial real estate development company that specializes in build-to-suit and speculative commercial projects.

It says that since 1990, it has developed more than 130 million square feet of space with an annual development volume topping $5 billion.

It has several projects in Northeast Florida.

 

×

Special Offer: $5 for 2 Months!

Your free article limit has been reached this month.
Subscribe now for unlimited digital access to our award-winning business news.